Wind Energy & Turbine Supply Chain

10 companies Updated 15 Jun 2026

NSE-listed companies across India's wind energy value chain — from turbine OEMs and casting suppliers to wind farm developers and O&M service providers powering the 125 GW capacity target.

Sectors represented: Capital Goods, Services, Construction, Power

Companies with exposure to wind energy & turbine supply chain

INOXWIND

Inox Wind Limited

Capital Goods
annual report · 2023

To maximize wind capture, our turbines are designed with hub heights of. 80/92/120 meters, enabling us to harness optimal wind speeds. Products. 1213. Corporate Overview. Statutory ReportsFinancial Statements. Annual Report 2022-23 r turbines are designed with hub heights of. 80/92/120 meters, enabling us to harness optimal wind speeds. Products. 1213. Corporate Overview.

SUZLON

Suzlon Energy Limited

Capital Goods
annual report · 2026

Total installed. wind capacity reached 1,299 GW, marking an increase of. 14% Y-O-Y, supported by accelerated deployment across. major markets. Financial StatementsStatutory Reports. Corporate Overview. 59 otal installed. wind capacity reached 1,299 GW, marking an increase of. 14% Y-O-Y, supported by accelerated deployment across. major markets. Financial StatementsStatutory Reports.

RAPIDFLEET

Rapid Fleet Management Services Limited

Services
annual report · 2026

Scale and pace - India is now the second-largest solar market in the world. Installed. capacity reached 145.83 GW in 2026 and is forecast by Mordor Intelligence to rise to 348.57. GW by 2031 at a 19.8% CAGR — one of the steepest growth curves in any large market in the world. Installed. capacity reached 145.83 GW in 2026 and is forecast by Mordor Intelligence to rise to 348.57.

WINSOL

Winsol Engineers Limited

Construction
annual report · 2026

More Than 50 KM Road and More Than 200 Acre Area Development of WTGs at Gujarat - Suzlon. . 5 KM Cable Laying work – Sembcorp. . 3MW Solar installation and commissioning – Winsol/Kaizen/JP. . Line Isolator Installation in 33 KV Pole Line.- Adani Group. elopment of WTGs at Gujarat - Suzlon. . 5 KM Cable Laying work – Sembcorp. . 3MW Solar installation and commissioning – Winsol/Kaizen/JP. .

KPEL

K.P. Energy Limited

Power
annual report · 2026

India’s gross wind power potential is estimated. at 1,163.9 GW at 150 metres above ground level,. and 695.5 GW at 120 metres, as assessed by. the National Institute of Wind Energy (NIWE). through more than 900 wind-monitoring stations ial is estimated. at 1,163.9 GW at 150 metres above ground level,. and 695.5 GW at 120 metres, as assessed by. the National Institute of Wind Energy (NIWE).

INOXGREEN

Inox Green Energy Services Limited

Services
annual report · 2026

The transition towards renewable energy is expected. to gain further momentum, with renewable sources projected to. account for nearly 43% of global electricity generation by 2030,. driven by sustained expansion in solar and wind capacity. 14 in further momentum, with renewable sources projected to. account for nearly 43% of global electricity generation by 2030,.

HAPPYFORGE Happy Forgings Limited Capital Goods
annual report · 2026

Nevertheless,. industry expansion will remain. dependent on macroeconomic. conditions, regulatory frameworks and. global trade dynamics. equipment demand. on projects are expected to. support this growth. Nevertheless,. industry expansion will remain. dependent on macroeconomic. conditions, regulatory frameworks and. global trade dynamics. equipment demand. Looking ahead,.

SOLARWORLD Solarworld Energy Solutions Limited Construction
investor presentation · 2025

Ongoing Projects. Capacity for EPC. 325 MW. 650 MWh. Ongoing Projects. Capacity for BESS. Our Portfolio ng. projects. 253.67 MW AC/. 336.17 MW DC. Total Capacity of Completed. Projects. 955 MW / AC. 1254 MW / DC. Ongoing Projects. Capacity for EPC. 325 MW. 650 MWh. Ongoing Projects. Capacity for BESS. Our Portfolio. Integrated EPC Framework. 7. ENGINNERING &. Design. Site. Assessment. Feasibility.

REFEX Refex Industries Limited Chemicals
annual report · 2026

Delays can affect equipment ordering, commissioning schedules, revenue. commencement and working-capital requirements. Project economics are also influenced by financing costs, tariff levels, construction timelines, wind. resource quality and actual generation. s, revenue. commencement and working-capital requirements.

ADANIENT Adani Enterprises Limited Metals & Mining
investor presentation · 2024

Solar. 614. 1379. 630. 1001. 1244. 2380. H1-24H1-25. Q1Q2. Quarterly Module Sales. 452. 1082. 792. 1298. 1244. 2380. H1-24H1-25. DomesticExport. Geographical Module Sales. 91% 0 GW▪Operational. Integrated Manufacturing. Solar. 614. 1379. 630. 1001. 1244. 2380. H1-24H1-25. Q1Q2. Quarterly Module Sales. 452. 1082. 792. 1298. 1244. 2380. H1-24H1-25. DomesticExport. Geographical Module Sales. 91%. 18.

See all 10 companies

Subscribe to unlock the full theme analysis and API access.

Start free trial
Search filings yourself →