Thermal Power & Baseload Generation

7 companies Updated 8 May 2026

NSE-listed companies with thermal power generation capacity — from utility-scale coal plants to turbine manufacturers and EPC contractors — regaining attention as grid stability concerns grow amid India's renewable energy surge.

Sectors represented: Power, Capital Goods

Companies with exposure to thermal power & baseload generation

ADANIPOWER

Adani Power Limited

Power
investor presentation · 2024

Technology. 78% Supercritical / Ultra-supercritical. 57% Supercritical / Ultra-supercritical. 100% Supercritical / Ultra-. supercritical. Power sale. tie-up. 73% under long-term / medium-term. contracts 0 MW. Technology. 78% Supercritical / Ultra-supercritical. 57% Supercritical / Ultra-supercritical. 100% Supercritical / Ultra-. supercritical. Power sale. tie-up. 73% under long-term / medium-term...

NLCINDIA

NLC India Limited

Power
annual report · 2026

Overall generation across several stations reflected a period of. subdued demand during the year, when a number of units were. placed under reserve shutdown in line with grid requirements,. before demand recovered later in the period. l stations reflected a period of. subdued demand during the year, when a number of units were. placed under reserve shutdown in line with grid requirements,.

CLEANMAX

Clean Max Enviro Energy Solutions Limited

Power
investor presentation · 2026

Summary of Operational Performance (1/2). ParticularsUnits. As at and for the Fiscal ended March 31,. 2026202520242023. Generation Exported. (1). Mn kWH. 3,343.422,615.921,932.681,048.85. C&I Operational Capacity. (2). MW perational Performance (1/2). ParticularsUnits. As at and for the Fiscal ended March 31,. 2026202520242023. Generation Exported. (1). Mn kWH. 3,343.422,615.921,932.681,048.85.

JSWENERGY

JSW Energy Limited

Power
investor presentation · 2025

Strategy 3.0 – Generation Capacity of 30 GW & Energy Storage of 40 GWh by 2030. 2.9. 26.429.3. 40.0. BESSPSP. Total. Locked-in. Target 2030. Locked-in Capacity of 29.3 GWh. Project Details. Battery Energy StorageCapacity (GWh). SECI (Rajasthan)1.0. SECI XV0.5. SECI (Kerela)0.5. Group Captive0.3. RVUNL0.5. FDRE0.1. Total2.9 al. Locked-in. Target 2030. Locked-in Capacity of 29.3 GWh. Project Details...

BHEL

Bharat Heavy Electricals Limited

Capital Goods
annual report · 2026

MW Telangana Stage-II (main plant package with Civil). from NTPC having air cooled condenser after a gap of. seven years. . . Secured order for 1x660 MW Amarkantak EPC and 1x660. MW Satpura EPC from MPPGCL. . Secured six sets of Steam Turbines (800 MW each) from. a private utility. oled condenser after a gap of. seven years. . . Secured order for 1x660 MW Amarkantak EPC and 1x660.

CESC

CESC Limited

Power
investor presentation · 2024

CESC Distribution –Malegaon. | RPSG Group Presentation. Start of operations. (Commenced on. 1. st. Mar’20). Distribution Area. Malegaon in. Maharashtra. Concession Period. 20 Years. Area. 57.6 sq.km. No. ner. 20. CESC Distribution –Malegaon. | RPSG Group Presentation. Start of operations. (Commenced on. 1. st. Mar’20). Distribution Area. Malegaon in. Maharashtra. Concession Period. 20 Years. Area.