In addition to this, Dhamra LNG terminal in Odisha has been. commissioned and ready for commercial operation. GAIL. placed its first cargo and started discharging LNG from 22. nd. May 2023. addition to this, Dhamra LNG terminal in Odisha has been. commissioned and ready for commercial operation. GAIL. placed its first cargo and started discharging LNG from 22. nd. May 2023.
Enhanced well-intervention. activity to sustain production. >3x capacity augmentation of. downstream product pipeline. ‘Growth-focused’ capex. 5x increase in CGD footprint. and infrastructure scale-up. 1.8x expansion of petchem. portfolio. 20K cr. investment committed. into renewables, CBG, biofuels,. and Green H2. Strengthened downstream. portfolio for integrated play. Future ready to empower.
India’s total natural gas consumption, share of LNG in. gas consumption and sector wise gas consumption is. depicted at chart 11 and Table 1, respectively. The share. of RLNG in India’s gas consumption stood at around. 51.5 % in the FY 2025-26. gas consumption and sector wise gas consumption is. depicted at chart 11 and Table 1, respectively. The share.
The continued growth in LNG imports is reinforcing the. importance of LNG receiving terminals, regasification facilities,. and associated downstream infrastructure. ture segments. The continued growth in LNG imports is reinforcing the. importance of LNG receiving terminals, regasification facilities,. and associated downstream infrastructure. Rising demand from.
Pipeline Expansion: India plans to augment its. natural gas pipeline network by adding over. 10,000 km, aiming for a total length exceeding. 35,000 km by 2030. LNG Import Capacity: With the commissioning. of new terminals and expansion of existing ones,. LNG import capacity is projected to rise to ng for a total length exceeding. 35,000 km by 2030. LNG Import Capacity: With the commissioning.
Most other terminals are running below. 30% utilisation. This is expected to improve with the completion of the breakwater at Chhara LNG Terminal,. Expansion of Dahej LNG Terminal by 5 mtpa and proposed Gopalpur LNG Terminal project. below. 30% utilisation. This is expected to improve with the completion of the breakwater at Chhara LNG Terminal,.
Shahdol. Barmer. Bhadbhut. Ankot. Dahej. IGX has 45+ registered Members and 200+ registered Clients. IGX Members and Clients. . Selected representation. Proprietary Member. Trading & Clearing Member. Clients. 29. 12.2. 50.9. 40.8. 60.0. 11.8. 24.6. 0. 20. 40. 60. 80. FY22FY23FY24FY25Q1- FY25Q1- FY26. Data till 30. th. June 2025. Yearly Volumes (Mn MMBTU)Quarterly Volumes (Mn MMBTU).
Capital Investment programme of INR 4,500 Cr under “Joint Business Plan”. with JV partner Royal Vopak, to be implemented from 2023-2027. 30. Project GATI:. Gateway Access to India. 01. Greenfield. Expansion. 02. Brownfield. Expansion. 03. Mergers &. Acquisitions. 04. New. Energy. 05 Plan”. with JV partner Royal Vopak, to be implemented from 2023-2027. 30. Project GATI:. Gateway Access to India. 01...
Future Growth. ▪Secured permits for LPG pipeline to connect with a national OMC's LPG terminal and. gain access to rail gantry. ▪Acquired 225,000 cbm liquid tank terminal owned by Vopak as part of the JV. ▪Acquired 500,000 cbm liquid terminal owned by Friends Group. Inorganic Expansion. 2022-23 nal and. gain access to rail gantry.
GA 06: 8,276 sq. km. Mahanagar Gas Limited. Annual Report 2025-26. Corporate. Overview. Statutory. Reports. Financial. Statements. 3534 Existing Steel Pipeline. Proposed Steel Gas Pipeline. (Work in progress). GA 06: 8,276 sq. km. Mahanagar Gas Limited. Annual Report 2025-26. Corporate. Overview. Statutory. Reports. Financial. Statements. 3534.
Liquid Oxygen Run Tanks &. LOX System for Test Facility. LOX Disposal System. Ln Tanks – Storage / Catch Tanks. 2. Gaseous Helium / Methane /. Nitrogen / Oxygen Systems. DM Water Tanks – Test. Stage A Bay. Engine Test Bay. Ambient Vaporizers – Storage est Facility. LOX Disposal System. Ln Tanks – Storage / Catch Tanks. 2. Gaseous Helium / Methane /. Nitrogen / Oxygen Systems. DM Water Tanks – Test...
GGL has commissioned its 5 LNG Storage & regasification facility (small scale) for CNG Customers in Nalasopara,. Thane GA. T GAS LIMITED. 57. 11.0 Setting up LNG storage and regasification facility:. th. GGL has commissioned its 5 LNG Storage & regasification facility (small scale) for CNG Customers in Nalasopara,. Thane GA.
GGL has commissioned its 5 LNG Storage & regasification facility (small scale) for CNG Customers in Nalasopara,. Thane GA. T GAS LIMITED. 57. 11.0 Setting up LNG storage and regasification facility:. th. GGL has commissioned its 5 LNG Storage & regasification facility (small scale) for CNG Customers in Nalasopara,. Thane GA.
Shri Narendra Modi while inaugurating India Energy Week. (IEW) 2023 in Bengaluru informed that the government is. working on mission mode to increase the consumption of natural. gas in India’s energy mix from 6% to 15% by 2030 where all the. needed infrastructure will be provided by ‘One Nation One Grid’. He further added that the terminal regasication capacity of 21.