Data Centre & Colocation Infrastructure

13 companies Updated 14 May 2026

NSE-listed companies building, equipping, and servicing India's rapidly expanding data centre industry — from hyperscale facility developers to server OEMs and power equipment suppliers.

Sectors represented: Media Entertainment & Publication, Construction, Realty, Information Technology, Capital Goods, Telecommunication

Companies with exposure to data centre & colocation infrastructure

TCC

TCC Concept Limited

Media Entertainment & Publication
investor presentation · 2026

Indian Cloud Computing Market. . (USD Bn). Rising Adoption of Edge & Decentralized. Computing. Demand for localized & decentralized storage to. reduce latency & dependency on hyperscalers. Growth in edge computing driving need for arket. . (USD Bn). Rising Adoption of Edge & Decentralized. Computing. Demand for localized & decentralized storage to. reduce latency & dependency on hyperscalers.

TECHNOE

Techno Electric & Engineering Company Limited

Construction
annual report · 2025

Colocation capacity. leased to hyperscalers has quadrupled over. the past five years. e. Hyperscalers and enterprises are expanding. rapidly, attracted by reliable connectivity and. lower capex and opex. Colocation capacity. leased to hyperscalers has quadrupled over. the past five years. Policy support, including. RBI and SEBI data localisation requirements.

ANANTRAJ

Anant Raj Limited

Realty
investor presentation · 2025

India’s Data Center Boom: Delhi NCR to Witness Significant Growth. Source: Cushman & Wakefield Research. 977 MW. Total Colo capacity. as of 2023. 2.32 GW. . Additional Colo. capacity. (U/C & Planned) %. 15%. 2%. India’s Data Center Boom: Delhi NCR to Witness Significant Growth. Source: Cushman & Wakefield Research. 977 MW. Total Colo capacity. as of 2023. 2.32 GW. . Additional Colo. capacity.

BBOX

Black Box Limited

Information Technology
annual report · 2026

Security System, and. DAS Systems Design. and Implementation. Geographic and. account strategy. ƒAppointed dedicated. regional leaders and built. highly focussed account. plans across priority. geographic clusters ity System, and. DAS Systems Design. and Implementation. Geographic and. account strategy. ƒAppointed dedicated. regional leaders and built. highly focussed account.

POWERINDIA

Hitachi Energy India Limited

Capital Goods
annual report · 2026

In parallel, IT load capacity is. expected to increase sharply from ~4.5 GW in 2025 to. ~12.5 GW by 2030, reflecting a robust ~22.7% CAGR. over the period. This growth is translating into substantial power demand. expansion. capacity is. expected to increase sharply from ~4.5 GW in 2025 to. ~12.5 GW by 2030, reflecting a robust ~22.7% CAGR. over the period.

HFCL

HFCL Limited

Telecommunication
earnings transcript · 2026

Measures such as the extended tax holiday for foreign cloud. service providers who will set up data centres in India underscore the government’s intent to. position India as a long-term hub for cloud, data centre, and AI-led infrastructure. cloud. service providers who will set up data centres in India underscore the government’s intent to.

MTARTECH Mtar Technologies Limited Capital Goods
annual report · 2026

AI rack could increase to more than 1.5. MW by the end of 2030, nearly 100 times. the power consumption of a. conventional rack. ding to Bank of America estimates. cited by Reuters, power consumption per. AI rack could increase to more than 1.5. MW by the end of 2030, nearly 100 times. the power consumption of a. conventional rack. As power density. increases, the corresponding.

INSPIRISYS Inspirisys Solutions Limited Information Technology
annual report · 2025

Organisations. are increasingly adopting hybrid and multi-cloud. environments, favouring service providers capable of. seamless orchestration, compute flexibility and storage. optimization. er. Organisations. are increasingly adopting hybrid and multi-cloud. environments, favouring service providers capable of. seamless orchestration, compute flexibility and storage. optimization.

RPTECH Rashi Peripherals Limited Information Technology
annual report · 2026

These trends are expected to strengthen demand for AI-ready PCs, processors, GPUs, memory, storage and other. computing components. 14. https://www.gartner.com/en/newsroom/press-releases/2025-11-18-gartner-forecasts-india-it-spending-to-exceed-176-billion-us-dollars-in-2026. 15. https://www.jll.com/en-uk/insights/market-outlook/global-data-centers. 16.

DSSL Dynacons Systems & Solutions Limited Information Technology
investor presentation · 2026

Revenue Contribution. (1). 21%37%13%29%. (1) For the year ending Mar’25. 6. 60. 125. 195. 308. 471. FY21FY22FY23FY24FY25. Data Centre and Cloud Infrastructure. Dynacons provides a robust portfolio of data centre and cloud infrastructure solutions. Private Cloud Solutions. Hybrid Cloud Solutions 08. 471. FY21FY22FY23FY24FY25. Data Centre and Cloud Infrastructure.

TCS Tata Consultancy Services Limited Information Technology
annual report · 2026

Green-TariffGreen tariffs are specialized retail tariffs that electricity distribution companies (discoms) charge for the. sale of Renewable Energy (RE) to their consumers. warming and climate change. Green-TariffGreen tariffs are specialized retail tariffs that electricity distribution companies (discoms) charge for the. sale of Renewable Energy (RE) to their consumers.

BHARTIARTL Bharti Airtel Limited Telecommunication
annual report · 2026

Our data centre business plays a critical role in driving. energy efficiency at scale while supporting the growing. demand for digital infrastructure. Anchoring this capability. is ‘Nxtra by Airtel’, which operates India’s largest network. with 14 hyperscale/core facilities and 120+ edge data. centres. ng the growing. demand for digital infrastructure. Anchoring this capability.

NETWEB Netweb Technologies India Limited Information Technology
investor presentation · 2025

Indian Data Centre Capacity (in Megawatts). CAGR : 53.4%. CAGR : 35.1%. The company’s current server models are typically. designed and built with the dual processor configuration. that enables multiple operations simultaneously, leading to atts). CAGR : 53.4%. CAGR : 35.1%. The company’s current server models are typically. designed and built with the dual processor configuration.

See all 13 companies

Subscribe to unlock the full theme analysis and API access.

Start free trial